This project is located in convenient transportation area. It consists of 265 mu developed land, 1,100 mu potential land for construction. In the westernpart of the industrial area, there is a 35KVA power station supplying abundant electricity. The project will construct pre-pressing, leaching production line by processing 200,000 tons of corn germ annually, low-temperature preservation, pre-pressing workshop and leaching workshop, with a newly introduced pre-pressing and leaching oil production line.

